1. Mazagon Docks
Ltd, Mumbai
Dec 2003 – Dec 2005
|
Warship –
Frigate
Scope of Work:
- Understanding the basic design drawings submitted by client.
- Prepare standard structural details for production and
obtain approval.
- Prepare production drawings, NC cutting data and Part list
- Prepare compartment layout
- Routing of pipes, cables and AC/Ventilation ducts.
- Prepare pipe spool drawings and BOM.
|
2. Cochin
Shipyard Ltd, Cochin
Jul 2004 – Ongoing
|
Air Defence
Ship
Scope of Work:
Augment the design efforts of Cochin Shipyard and the
Indian Navy in the preparation of compartment layout
drawings, verification of structural drawings and
preparation of Volume models of equipment in TRIBON. A
team of 30 engineers headed by a project manager is
positioned at the Directorate of Naval Design at New
Delhi. |
3. NK, Japan
Sep 2004 – Dec 2004
|
Bulk
carrier & Crude carrier
Scope of Work:
Prepare faired hull surface from offset table and make
3D TRIBON structural model of a Panamax Bulk Carrier and
an Aframax Crude Oil Carrier for FEA analysis of the
Ships structure. |
4. Mazagon Docks
Ltd, Mumbai
Mar 2006 – Sep 2006
|
2000 Cu.
Mtr. Cutter suction Dredger
Scope of Work:
- Understanding the basic design drawings submitted by
client.
- Preparation of production drawings and Part list
using AutoCAD.
- Prepare compartment layout drawings.
- Prepare pipe, cable and ventilation duct drawings.
|
5. Sembawang
Shipyard Ltd, Singapore
May 2006 – Dec 2006
|
Drill Ship
– Phase – I
Scope of Work:
- The structural model of Drill Ship Living Quarters has
to be prepared by referring to the classification
drawings supplied by Sembawang shipyard. The production
drawings and the Nesting documents are also prepared.
- The work also involves development of components for
Engineering / Outfitting /Electrical/ Structural /
Miscellaneous components. The piping, routing and
ventilation modeling is also done by Conceptia for this
project.
- Prepare collision free compartment layouts, Pipe spool
sketches, P& I diagrams and all electrical design
documents including Lux calculations.
Drill Ship – Phase – II
Scope of Work:
Along with yard personnel go onboard the ship, carry out
Line out inspection and make appropriate modifications
to production drawings to solve problems on board.
Prepare as fitted drawings. |
6. BSL, Mumbai
Oct 2006 – Sep 2007
|
Anchor
Handling Tug cum OSV
Scope of Work:
- Prepare faired lines plan and suggest modifications to
offset table data points.
- Prepare 3D model of the Anchor Handler in Tribon 3D
modeling software. Positioning of seams in panels based
on material order list; prepare production drawings
assigning position nos to each and every part, assign
excess and shrinkage values. Prepare nesting sketches,
NC codes.
- Prepare equipment layout and pipe arrangement drawings
and ensure collision free arrangement of equipment,
pipes, cables and ducts complete with maintenance spaces
and insulation.
- Prepare pipe spool sketches.
- Inspection of structural blocks after construction and
clearing production related problems.
|
7. Dubai
Dry-docks, UAE
|
A large team
of Conceptia engineers are working on various projects (FPSOs,
Seismic Exploration Vessels etc) in Dubai Dry docks and
Sembawang shipyard helping to augment their team
strength as a strategic partner.
Conceptia team providing world class engineering
services for new building, conversion and repair
projects in piping, structure and electrical
departments.
Conceptia engineers are engaged in detailing for pipes
and structure, material management, project monitoring,
site and yard coordination in FPSO conversions and new
building projects.
Our team is serving our clients also in design reviews,
NDT and test packs, material reconciliation etc. |
8. Pipavav
Shipyard, Gujarat, India
Mar 2008 - Nov 2008
|
Pipavav
Shipyard has signed a 02 year strategic partnership with
Conceptia for engineering. Under this contract Conceptia
will provide detail engineering support to PSL for their
Gantry Cranes as well as Panamax bulk carriers that are
under construction at India’s largest Greenfield
shipyard. |